Where applicable, is testing of physical or chemical properties done, and if not, is certification of the component quality required from the manufacturer?
Both methods are used based on the material and the overall quality level of the supplier. 21. Describe the process by which drawings and test procedures are updated to reflect the latest changes. All drawings and test procedures are maintained under document control. An engineering change notice is initiated and approved whenever a change is required.
Both methods are used based on the material and the overall quality level of the supplier. Top 21. Describe the process by which drawings and test procedures are updated to reflect the latest changes. All drawings and test procedures are maintained under document control. An engineering change notice is initiated and approved whenever a change is required.
Related Questions
- Where applicable, is testing of physical or chemical properties done, and if not, is certification of the component quality required from the manufacturer?
- What is the difference between a certificate of compliance and a full certification (also known as chemical and physical certification)?
- If a manufacturer does not have (know) specific physical and chemical properties, must testing be performed?