What Steps Are Being Taken to Minimize Inconvenience During Construction?
Two (2) travel lanes are being maintained at all times during construction with the possible exception of temporary short duration lane closures for certain operations. Lane closings are prohibited during rush hour periods and other important times. In addition, access to all businesses along the project Route is being maintained.