What happens when entering a modification where the reason for modification is Change PIID?
• When Change PIID reason for modification is selected, the PIID or the PIID agency code or both must be changed and the validation rules for change PIID will fire. • The following fields are available for editing and at the very least the PIID or the PIID Agency code must be changed: • PIID Agency code • PIID • Modification Number • Date Signed • Contracting Officer Agency ID • Contracting Officer • Effective Date • Once Save Draft is selected the user will be unable to change\correct the piid or piid agency code. If a mistake was discovered while still in a draft status the contract action report can be deleted.