Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

Other pit optimization programs create pushbacks and schedules. Why should I buy NPV Scheduler?

0
10 Posted

Other pit optimization programs create pushbacks and schedules. Why should I buy NPV Scheduler?

0
10

NPV Scheduler provides you with tools to achieve the following tasks: • Design or import practical pushbacks. There are good push-back design features within NPV Scheduler, and realistic design constraints can be imposed. NPV Scheduler does not use phases from optimization as the start point for push-back design. • Consider alternative pushback sequences. • Obtain realistic mining schedules that take into account any number of crucial targets like ore production rate, stripping ratios, cash flows, blending, contamination control, etc. • Determine realistic NPV estimates that can be very different from the very tentative figures produced by other products. By Scheduling we do not mean sequencing – which is exactly what MaxiPit does. Scheduling starts from a practical set of pushback designs, which are then scheduled for Optimum NPV. Beware of the expression “sub-optimal maxima”: either the schedule is optimized or it isn’t – its a bit like calling something “almost unique”. A further en

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123