How should an administration notify a digital allotment requirement associated with a number of transmitters of which the technical parameters are known?
In this case, the administration should notify each transmitter separately as an assignment requirement using notice form DT1 or DS1 as applicable. If two or more assignment requirements are associated with an allotment requirement then each DT1 or DS1 notice should include data element rrc_sfn_id (SFN identifier) of the same value that identifies that all assignments are part of the corresponding network and data element rrc_sfn_tx_tim to indicate the relative timing of the transmitter within the SFN. The data element rrc_sfn_id, a maximum of 30 characters, must be unique for an administration. If only one assignment requirement is associated with an allotment requirement, then the fields rrc_sfn_id and rrc_sfn_tx_tim are only required in the case that this network is an SFN and can be omitted in the case that these requirement form part of an MFN. Each DT1 or DS1 (assignment requirement) notice associated with a DT2 or DS2 (allotment requirement) should also contain in the field, rrc
Related Questions
- How has the Federal Aviation Administration contributed to the research associated with licensing digital I&C safety systems at new reactors and as retrofits in current nuclear power plants?
- How does an administration notify a digital requirement with its transmitting antennas radiation pattern having a beam tilt (maximum ERP not in the horizontal plane)?
- How should an administration notify a digital allotment requirement associated with a number of transmitters of which the technical parameters are known?