How often does URAC expect a Health Information Exchange (HIE) entity to conduct pre-implementation systems testing?
Response: Pre-implementation systems testing pursuant to the standard should be conducted at least on an annual basis as well as on an as-needed basis (e.g., technology changes, additional security interfaces added, changes to the law/security rule, etc.) This testing usually follows an interoperability analysis.