How far should suppliers down-select the choice of control algorithms in their proposal?
A. Proposing to study all possible algorithms is not recommended. Suppliers should propose to study a modest subset of algorithms which are well matched to their proposed hardware options. ____________________ CLARIFICATION: Proposals will be due in 30 business days following the RFP, or in about six weeks. ____________________ CLARIFICATION: TMT is open to proposals with Conceptual Design Study durations from 6 to 9 months.