Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

How do I replace cast iron pipe from concrete septic tank to holding tank?

0
Posted

How do I replace cast iron pipe from concrete septic tank to holding tank?

0

Before starting the work, have both the septic tank and the pumping chamber pumped out. At this point, you may be able to snake out the line between the two, which will be much easier than replacing it. If it does need to be replaced, dig up the area, including about 6 inches below the pipe. The pipe will likely need to be cut to get it out. Make 2 cuts, take out the center piece, then pull out the other two pieces from the tanks. Do not make the hole in the tanks any larger than you need to. Add about 2″ of 3/4″ gravel to just below the tank openings. Replace the old cast iron pipe with schedule 40 PVC pipe. Be SURE the pipe drains the correct direction! Seal the pipe into the tanks with Quikrete and allow to cure according to the package directions. Fill around the pipe with 3/4″ gravel – should have at least 2″ below and 2″ inches above the pipe. Then cover the pipe back up with soil – you’ll want to mound the cover dirt slightly to allow for a bit of settling.

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123