How are coal piles surveyed?
The field survey encompasses traversing the coal pile with the Mobilmapping Unit. Data points are collected at 10 foot intervals. Areas unable to be traversed are remotely located using a Trimble Direct Read Total Station surveying instrument. In the case where borings are needed, we can also locate these spots if requested.