At what stage is BioBased Insulation installed?
BioBased Insulation is installed after the windows, doors and roof systems are in, the electrical, framing and plumbing inspections are complete, and after any other electrical or mechanical system located behind the drywall is installed. It is the last installation to take place before drywall installation.