Would the proposed Project expose sensitive receptors to substantial pollutant concentrations?
Construction activities and associated emissions generated during the various TRTP-specific construction phases could potentially affect sensitive receptors located near the construction zones. The use of construction equipment could create air quality impacts, but with the implementation of the APMs provided in Section 4.4.5 (Section 4.0), Project-specific localized air quality impacts would be expected to be minimal and considered to have a less than significant impact. After construction of the entire TRTP was complete (i.e., in 2013), operational emissions would be generated from the operation of maintenance vehicles driven to the TRTP sites, parked for a short duration, then driven off, and, therefore, would be negligible. Hence, the emissions generated from the construction and operation of the proposed TRTP would not be expected to expose nearby sensitive receptors to substantial pollutant concentrations. The incremental contribution of pollutants from the TRTP on nearby sensiti