Would it be possible to change the calculated result from unavailability to availability (for multi path, refraction and rain) in a path quality report?
Yes it is possible. Please click here to download the Result_5_availability.rrt file. Use this rrt file when you need to present probability (multi path, refraction and rain) result for availability instead for unavailability (example: from 0.004% unavailable to 99.996% available). The file can also be used as a reference when producing custom made rrt files.