With upgrades into the Midway Substation, would a QF tied into PG&E through the Midway Substation be considered for the bid?
Yes, a QF interconnected at the Midway Substation is eligible. 19) We have an existing QF that has been interconnected to a substation within NP15 for a number of years and we are contemplating bidding into the RFO. Do we need to file for a SIS and get a FS? (also Section IX, Q 19) (11-24-04) Please refer to this web site for information regarding existing generation and the need for an SIS/FS: http://www2.caiso.com/docs/2002/06/11/2002061110300427214.html. Please contact via e-mail if you have any further questions. 20) I have several potential QF projects which may interconnect near to what I believe is “Path 15.” I’m not sure if these are located in the CAISO ZP 26 or NP15 zones. Can I sell power to you from either, or both of these sites? (also Section IX, Q 20) (12-2-04) QFs in ZP26 or NP15 or which can provide firm physical deliveries to NP15 are eligible to bid into the PPA RFO.