Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

Will prequalification in TRAFFIC ENGINEERING and ELECTRICAL ENGINEERING services be apart of the project requirements?

0
Posted

Will prequalification in TRAFFIC ENGINEERING and ELECTRICAL ENGINEERING services be apart of the project requirements?

0

Any necessary Traffic Signal design will be by the Department. Prequalification in Traffic Engineering or Electrical Engineering will not be required. 2008-07 Jefferson 5-8203.00 Billtown Road QUESTION: The current ad for Billtown Road (5-8203.00) shows an estimated fee of $650,000. However, the construction costs in the study for the spot improvements at the areas listed in the bulletin are less than $1 million. Can you clarify how the fee was determined? ANSWER: The Construction Estimates in the Study are as follows: Billtown at Michael Edward and Fairground $660,000 Billtown at Mary Dell $ 75,000 Billtown between Vintage Creek and Colonnades $180,000 Billtown at Lover’s Lane $330,000 Billiton at Easum $200,000 TOTAL $1,445,000 The estimate Phase I and Phase II design costs for these spot improvements range from $150,000 to $250,000 per location with the exception of Billtown at Mary Dell which is estimated at $15,000. Phase II design is to be negotiated at the end of Phase I and add

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123