Why the lead time of outdoor screen is longer ?
(1)materials purchase: the purchase term of LED lamps is longer, special imported chips, the lead time takes 4-6 weeks (2)complicated producing technics : need PCB design, cover making, glue filling, white balance adjust, etc (3)strict structure requirements: design for cabinet, need to consider windproof, rainproof, lightningproof , etc.