Why should I purchase a metal building vs. concrete or a container?
The pre-engineered steel training structure provides highest quality, designed safety, realism, true usability with actual flexibility of design as part of the overall project cost for the facility and backed with warranties. Neither of the other two methods provides all of these assets with the product nor are they backed with warranties.