Why isn’t the Agricultural Building part of the central biomass heating plant?
The cost benefit analysis did not support putting the Agricultural Building onto the wood plant at his time due to the limited natural gas usage of the building and the potential energy savings Vs the cost of connecting the building to the central heating plant. Provisions have been made however within the central heating plant design to include the Agricultural Building at a later date.