Why is there a proposal that suggests terminating Wimbledon Loop trains at Blackfriars?
Basically, it is a measure designed to simplify train movements, keeping trains from crossing one another’s paths, helping to reduce delay and improve reliability. It would also help to achieve the target of up to 24 trains per hour from Blackfriars through central London to St Pancras and beyond. Thirty-two trains per peak hour are currently planned to approach Blackfriars from the south when the Thameslink Programme is complete, from December 2018. In total, 24 trains per hour will go through to St Pancras and beyond, and eight per hour will terminate in new bay platforms on the western side of the layout at Blackfriars. The view of the team that compiled the South London Route Route Utilisation Strategy, a view also adopted in the London and South East Route Utilisation Strategy, was that the success of the 24 trains per hour operation will depend upon a very high level of operating performance. To give it the best chance of success, train paths should therefore cross one another as
Related Questions
- I have read that trains from the Wimbledon Loop are going to terminate at Blackfriars station from December 2018. Is that true?
- I have read that trains from the Wimbledon Loop are going to terminate at Blackfriars station in 2018. Is that true?
- What is the best way to get from Los Angeles to San Francisco ?