Why is the Lebanon Community School Corporation considering facility improvements?
In Lebanon, it’s about learning. Lebanon High School is a nice building, but it was built in the 1950s — it wasn’t built for today’s technology. Today’s students use technology nearly every minute outside the classroom. We must keep up with how kids learn – and prepare students for today’s jobs with a 21st Century education. st1\:*{behavior:url(#ieooui) } Classrooms at L.H.S. were designed before technology and collaborative projects became such an integral part of learning and when the average physical size of students was smaller. Many classrooms at L.H.S. feel cramped. Extensive renovation is needed at Lebanon High School to incorporate instructional technology and to reduce energy costs. In an economic environment where school districts must find operational cost savings, the money saved on energy can be put to better use in staff and instruction.