Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

Why is installation time shorter (for walls and slopes) when Eljen EPCDS is used compared to other drainage products?

0
Posted

Why is installation time shorter (for walls and slopes) when Eljen EPCDS is used compared to other drainage products?

0

The Eljen EPCDS has two tie straps on each panel with are easily and quickly attached to the wall or slope so that the panel is held in to place before backfilling. Other products require nails to be driven through the material or for the product to be glued to the wall. Eljen EPCDS drains are completely prefabricated less any drainage pipe. They are complete with overlap flaps for connection. Extra drainage fabric is included on all Eljen EPCDS drains to facilitate on site changes.

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123