why is design-build usually the most efficient and cost effective way of building?
The planning process consists of a team of owners, construction experts, architects, engineers, facility users, design-build subcontractors, project coordinators, estimators, and schedulers. The process decentralizes decision making, empowering the participants to develop the most cost effective design to satisfy owner requirements. The schedule takes all factors and involved parties into account and so it is both timely and cost efficient. The designers are brought in as part of the team so cost effective proven methods of construction are brought forth in the drawings, the first time.