Why is a pre-drainage and final drainage inspection required on pool permits?
A. The Town wants to make sure that your property does not obstruct any drainage flow to your property or your neighbors. View the Pool Information Packet. The Town Engineering Department conducts the pre and final drainage inspections. Please contact Building Inspections at 972.874.6355 for more information. You may also contact the Permit Specialist regarding the above information.