Why does the progress indicator show a wrong value?
When a Natural mainframe environment has been mapped and a library is being added to the NaturalONE workspace, it may happen that the progress indicator (NaturalONE status line in the right corner) already displays 100% but the download has not yet been finalized. The reason may be that the statistics record on the mainframe is not correct. This may happen, for example, if the Natural system file is write-protected via Adabas security or marked as a read-only system file via the RO option of the profile parameter defining the corresponding system file. Therefore, make sure that the system file has read/write permissions.
Related Questions
- Can an exception be used if the ELL Progress Indicator is the only measure that prevents a campus or district from being rated as Recognized or Exemplary?
- In the BeadStudio 2 Gene Expression Module, the MIN_Signal, AVG_Signal, and MAX_Signal columns all have the same value. What is wrong?
- Are students tested on the Linguistically Accommodated Testing (LAT) included in the ELL Progress Indicator?