Why does the electrical contractor have to request an electrical permit for the installation of the Power MonitorTM?
Some cities may require an electrical permit for all Power MonitorTM installations. An electrical permit grants the contractor permission to perform the requested installation, and at the same time, serves as a mechanism to ensure that the installation complies with current local electrical codes. After the installation is finished, the electrical contractor will be required to call for an inspection. You may be required to be present at the time of inspection.