Why does other films take shorter time to install and V-KOOL require longer time?
V-KOOL is composed of 7 atomic metal layers using high tech sputtering process. With multiple layers of metallic coatings, the film requires greater technique and skill for installation. V-KOOL is a premier product with high quality and therefore deserves greater time and care in putting the film on. Other conventional dyed films are usually ordinary dyed films or reflective films with one layer of metal. These films are not densely coated and therefore can be installed in a much shorter time.
Related Questions
- Average build time runs about 6 weeks but could be shorter or longer due to workload or availability of materials. How much is shipping?
- Why do Corporate/Executive packages require a longer turnaround time than other packages?
- Can I require a time period shorter than one year for completion of missing work?