Why can’t we have a project that goes along SR-60 and also connects with cities like Pico Rivera and Whittier?
During the Alternatives Analysis (AA) phase of the study, Metro examined 47 alternatives, which included two alternatives that would connect northern cities with southeast cities within the study area. However, these two alternatives had slower travel times, lower ridership, and were not as cost-effective compared to the other alternatives that performed better. Therefore, those two alternatives were dropped from further consideration.