Why aren’t all value engineering recommendations implemented?
A Value Enginering team is encouraged to challenge the accepted design and sometimes the base case design is the best value. Although the value engineering team attempts to do all it can to verify the validity and technical soundness of its recommendations, the team has limited time and resources with which to do this. Therefore, after the workshop, the team’s recommendations must be further analyzed before a decision is made to implement each recommendation.