Why are there so many pages in the “Mechanical Plan Review” Section? Doesn that make the process pretty cumbersome?
As you can see from the “Table of Contents” and “Examples” pages, the “Mechanical Peer Review” Package is intended to be all-inclusive and to cover most of the types of Projects that are associated with HVAC Engineering. The “Mechanical Plan Review” Section is organized by Plan Types, such as “Legend and Symbols Sheet”, “Schedule Sheets”, “Mechanical Ductwork Floor Plans”, etc. The “Schedule Sheets” are further organized alphabetically by “Equipment Type”, with hyperlinks to each Equipment Schedule checklist. The “Mechanical Detail Drawings” are arranged by “Type of Detail” and also alphabetically, and also have hyperlinks to the Detail checklist. With the “logical” organization and extensive hyperlink navigation, the review items are relatively easy to use and provide a very thorough Review of most HVAC Projects.