Why are Sewage Disposal System Permits needed?
To ensure proper functioning sewage treatment systems are installed. This ensures that drinking water sources and the environment are not polluted. Why are Plumbing Permits needed? To provide a supply of safe drinking water and discharge of sewage to an appropriate disposal facility. When is Sewage Disposal System Permit required? Permits are required anytime an alteration to a Sewage Disposal System system is made or required. They are also required to install new Sewage Disposal System systems. The municipality enforces regulations for systems with a flow of 10,000l/day or less per piece of property. When is a Plumbing Permit required? Whenever plumbing or drains are installed or altered, a permit is required.