Why are housing permits required for home repair? And why is a building inspection required before a home can be sold?
Preserving the integrity of our buildings is a top Village priority. That’s why carefully crafted procedures and guidelines have been put in place to ensure that our older buildings continue to be well-maintained. Procuring a permit from Shorewood’s Planning and Development Department is necessary before beginning any building, electrical, plumbing or HVAC work. The permit generates an inspection by a building inspector to make certain that the work is done to national, state and local standards – and to protect the health, safety and welfare of residents. When a home is put up for sale, before the sale can be completed, a building inspection is required to ensure everything is up to code. The staff in Shorewood’s Planning and Development Department will be happy to work with you to make the process of obtaining permits as smooth and easy as possible.