Who provides the No. 2 oil pump?
The No. 2 oil pump and automatic equipment (on boilers under 40,000 lbs/hr) are generally provided as an integral part of the boiler. Atomizing steam and atomizing air piping (for start-up) is also provided for No. 2 oil firing. Heaters for No. 6 oil firing (on select boilers) must be provided by the Lessee..