Who is responsible for applying for a construction stormwater permit?
The operator is responsible for applying for the permit as required by 40 CFR 122.21(b). The operator is the person who has operational control over construction plans and specifications, and/or the person who has day-to-day supervision and control of activities occurring at a construction site. In some cases, the operator may be the owner or the developer, in other cases the operator may be the general contractor, in some cases both entities will be considered operators. Some States require a single entity, usually the land owner or easement holder, to be the permittee for a given construction project. Other States and EPA require all relevant entities to obtain permit coverage, as co-permittees, for a given construction project. Contact your permitting authority for clarification on who must apply.