Who is funding the SR 125 South expansion?
The project is divided into three segments. The first two segments of the project are the Connector, a 3.2-mile publicly funded section from SR 54 to San Miguel Road in Bonita. The second segment, called the Gap, is a freeway-to-freeway interchange involving the reconstruction and expansion of an existing section of SR 54 where it intersects with the new route of State Route 125 South. The cost for the Gap and Connector portions of the project will come from federal aid matched with SANDAG’s TransNet local transportation sales tax revenues. The third segment, the remaining 9.3 miles of the project running from San Miguel Road/SR 54 to Otay Mesa Road/SR 905 will be a privately funded toll road operated and maintained by California Transportation Ventures, Inc. (CTV).