Who is best qualified to supervise the work being done? What type of progress reports should be submitted to the owners and how frequently?
The building envelope professional, or an architect or engineer should review the work and report to the strata corporation on a pre-determined schedule as required by their contract. However, they do not supervise trades. The contractor supervises, and this is one of the reasons why it is important to choose the contractor carefully.