Where was the flood barrier testing performed?
The flood testing was performed at the U.S. Army Corps of Engineers’ Engineering Research and Development Center (ERDC) in Vicksburg, Mississippi conducted extensive testing on Infrastructure Defense technologies’ Metalith H2O flood control barriers. Testing was performed in late April and early May of 2007.