Where is joint of fence types?
Bid the quantity on Engineer’s Estimate and not scale. Fence joint at “MO” 13 + 15 LT. 3) On Drawing L-3, is Chain Link fence along L-2 match line an extension of temporary fence from L-2? No. Chain Link fence on L-2 matches Chain Link fence on L-3. 4) On Drawing C-2, temporary stockpile is called out in legend but not shown. What is location, size & contents? Drawing C-2 legend reads “TEMPORARY STOCKPILE COVER” and not “TEMPORARY STOCKPILE.” Temporary stockpile locations are not shown on plans. A temporary stockpile cover detail is shown on Plans, Sheet C-5. 5) Is the water line to be relocated by others as shown on the utility plan? The 254 mm raw water is to be relocated by the others. 6) Is testing required during earthwork due to hazardous materials, for example: air monitoring? Caltrans is requiring the testing in the contract plans, special provisions, and the standard specifications. 7) Mococo Railroad crossing in the specs for maintaining traffic and railroad relations, it sta