Where do I get a copy of the FONSI and the bridge proposal?
A copy of the FONSI and the bridge proposal is available on the website, www.lakebridges.com, and at the Kentucky Transportation Cabinet District 1 office. • When was the FONSI completed? What were the basic findings? The final FONSI was completed in September 2006, and approved on October 24, 2006. Section 1.4 “Summary of Purpose and Need” now reads: ” In summary, the proposed project is needed to correct numerous geometric deficiencies of the existing roadway and the two major bridges (Eggner’s Ferry and Lawrence Memorial Bridges over the Tennessee and the Cumberland Rivers, respectively). The project is also needed to support the Southwestern Kentucky Region’s economic development efforts, which are tied to having a safe and convenient roadway that connects to the regional transportation network. • What relationship do the bridges have with the 4-lane work? The planning, design and construction process for the bridges is taking place separately from the 4-lane work. However, both pr
A copy of the FONSI and the bridge proposal is available on the website, www.lakebridges.com, and at the Kentucky Transportation Cabinet District 1 office. • When was the FONSI completed? What were the basic findings? The final FONSI was completed in September 2006, and approved on October 24, 2006. Section 1.4 “Summary of Purpose and Need” now reads: ” In summary, the proposed project is needed to correct numerous geometric deficiencies of the existing roadway and the two major bridges (Eggner’s Ferry and Lawrence Memorial Bridges over the Tennessee and the Cumberland Rivers, respectively). The project is also needed to support the Southwestern Kentucky Region’s economic development efforts, which are tied to having a safe and convenient roadway that connects to the regional transportation network. • What relationship do the bridges have with the 4-lane work? The planning, design and construction process for the bridges is taking place separately from the 4-lane work. However, both pr
Related Questions
- Does ISTPCanada expect to get a copy of the IP agreement among the partners? Should the agreement be signed before submission of the full proposal or only after the funding has been confirmed?
- What is the history of the proposal chosen to build a second bridge as opposed to simply adding another deck to the current 1950 bridge?
- Where do I get a copy of the FONSI and the bridge proposal?