When testing a casement window which has three separate locks that are not activated by single action hardware, what is the test sequence in TAS202?
First, engage all locks and perform the air infiltration test. Second, disengage all locks and only engage the center-most (main) lock. Perform the 75-mph load test and water test as described in TAS202. Third, engage the other two locks and perform the remaining procedures in TAS202. forced entry resistance test (F.E.R.) shall be done with all locks engaged.
Related Questions
- When testing a casement window which has three separate locks that are not activated by single action hardware, what is the test sequence in TAS202?
- Can I integrate my own proprietary hardware into the Spectrum test platform to facilitate special testing?
- Prometric shows seat availability after the annual testing window. Can I test later?