When is the best time to install a Beam System in new home construction?
Installation of a Beam system is done in two steps. Central vacuum tubing, inlet valves and low-volt wiring are roughed in after plumbing and electrical work is completed and before drywall or other interior wall surface is installed. The power unit installation and final installation of inlet valve covers occurs during the final stage of construction. A Beam dealer is an experienced sub-contractor available to complete the installation and follow-up sales, warranty and service.