When I receive my delivery how do I know where each wall frame or truss or Longreach floor truss is supposed to go?
Each wall, truss or Longreach has a number on it when it leaves the factory. These numbers correspond to the number indicated on the layout sheet that is sent out with the delivery. Wall frames also have an arrow next to the lettering indicating the way the wall is to run. The layout sheet is laminated for ease of use on site.