When budgeting for parking lot repair and maintenance, what generally gives me that best bang for my buck?
The answer depends on the current state of health of your parking lot. If the lot was well constructed and is not showing significant subbase failures (more than 5% of the lot) then the best option usually is to start and maintenance and seal coating program. This involves filling cracks, cutting out and replacing severely deteriorated areas with full depth asphalt, seal coating with 2 coats of a good cold tar sealer like Amguard, and restriping. This should be done every 3 – 5 years, depending upon how much traffic your lot has. You will find that over time, the amount of patch work (which is the most costly component) will go down. Sometimes the only flaw is that too thin of a layer of asphalt was put over a good sub base. In this case patching and overlay is a viable option. If subsurface water is a problem, than French drains may need to be installed prior to the overlay. There is no “one solution” for repairing every parking lot. Professional Paving & Concrete estimators look at e
Related Questions
- When budgeting for parking lot repair and maintenance, what generally gives me that best bang for my buck?
- When budgeting for parking lot repair and maintenance, what generally gives me the best bang for my buck?
- When budgeting for parking lot repair and maintenance, what general guidelines should be followed?