When and why were sites south and east of US 1 (20, 22, 25, 28) eliminated from consideration?
The WRF site selection process was conducted concurrently with the evaluation of four alternative wastewater management options (Option 1, Option 5, Option 9, and Option 10D) that included construction of either one or two new water reclamation facilities. Sites 20, 22, 25 and 28 were identified as candidate sites for Option 9, which would have required the construction of two new water reclamation facilities: (a) one facility to serve the southern portion of Apex and all of Holly Springs, and (b) one facility to serve the northern portion of Apex and the western portions of Morrisville, Cary and all of RTP South. Based on the information and data collected, reviewed and evaluated for the four alternative wastewater management options, the Towns, with the concurrence of NC DENR staff, determined that Option 10D was the preferred wastewater management option because it resulted in the least costs and the least environmental impacts. With the selection of Option 10D, and the determinatio