Whats the Process of Laying stamped concrete?
In brief, stamped concrete is laid like this: Place the concrete. Concrete should be no less than four inches thick. Add color. Color is added either in the mixer or after concrete placement. The first method is called “integral coloring” and the second method is called “broadcast or surface coloring.” Broadcast coloring involves evenly spreading dry color across the surface of the concrete. Apply release agent. Release agent allows the texturizing mats to come off without taking off concrete. Lay mats. Texturizing mats are laid in succession. Since there are usually not enough mats to cover the entire surface, when one is finished it is applied to another area of the concrete. Let dry 24 hours. Pressure wash the release agent off. Clear sealing.