What’s the next step for The Living Murray?
The next steps for The Living Murray are: • to complete major infrastructure development at the icon sites to help deliver large volumes of water to the floodplain at regulated flow river heights • to move into the main operational phase of the project, which is likely to involve the delivery of larger volumes of water than previous years, with the finalisation of the water recovery program over the coming months. Further environmental watering requirements for the Murray River will be developed in the context of the Basin Plan currently being developed by the Murray–Darling Basin Authority.