What will happen to the portable buildings?
Once construction has allowed for adults and grade-school children to move into the Bridge, the portable small group meeting rooms will be removed and two distinct outdoor playgrounds will be constructed on the site. The two newest portable buildings may be retained to be used by the church family. One playground will be designed to accommodate young children, the other separate space purposed for older children. A walkway will unite this area between the Bridge and north side entrances to the current children’s area. How long will it take to build the Bridge? Construction is proposed to begin late 2009 with an estimated completion date in 2011. How big is the Bridge? The Bridge is tentatively designed at 51,000 square feet covering two stories. Think of it as two times the size of Elevation or four times the size of the senior adult building. What is being done in the worship center foyer and how does it relate to the Bridge? The worship center foyer is being expanded by aproximately