What will happen to the PCB contaminated soil at the site?
The contractor will remove the PCB contaminated materials and transport them to an approved destruction facility in Quebec. 11. How much PCB contaminated soil will be removed? There are approximately 35,500 cubic meters (78,000 tonnes) of PCB contaminated soils, sediments and debris to be removed from the site. On-site infrastructure will be removed, and the storage areas will be backfilled with clean soil. A detailed assessment of the site will be conducted after the cleanup to ensure that it was properly decommissioned.