What was the size and scope of the ISA that was performed at Maine Yankee in 1996?
The Maine Yankee ISA team consisted of 25 members. In addition to three State representatives, six NRC contractors and an administrative assistant participated on the team. The team spent 4 weeks conducting onsite inspections. The ISA was conducted over a 3-month period. The team was independent in the sense that it did not include any Region I inspectors and the team reported directly to the Director of the Office for Analysis and Evaluation of Operational Data, and not to the regional management.