Even though it wasn’t required by the Superfund process, DEQ made the 30% Design Report for East Mission Flats available for public review. The intent of this comment period was to accept comments on the technical design and configuration of the repository. The 30% Design Report is a preliminary design that will be used to help create the final design. Another public comment period will take place in 2008 when the design becomes more complete.