What was the purpose of the hydropower and seaway project?
• Dependable water for hydropower generation, sufficient water levels and flows for Seaway navigation, and flood reduction both upstream and downstream of the projects were the main objectives. These are reflected in a series of Criteria and requirements in the IJC’s Orders of Approval allowing for the construction and operation of the project.