What was the Most Cost Effective Option besides the Renovation/Addition Project?
The deferred maintenance and code upgrades without the provision of portables to house the expected 375 additional students option had an estimated cost of $6.77 M with local taxpayers picking up 100% of the cost (no state aid). The various committees working on this project decided not to select this option because there was no provision to house the increased enrollment and the desired educational program could not be met with this option.